CARLO GAVAZZI EN61036 Provozní pokyny Strana 8

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 18
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 7
14
ENGLISH
15
ENGLISH
Screwdriver
PRELIMINARY OPERATIONS
Before supplying the instrument, make sure that the power supply
voltage corresponds to what is indicated on the lateral label of the
relevant module. For example:
AP1020
Universal power supply
input range: 100V...240V DC/AC (50Hz to 60Hz)
power consumption: 12W / 30VA 1 PHASE
serial number: S/N 002700/20345
Preliminary operations
The various modules (input, output and power supply) have been
conceived to be mounted in the proper slots. To know in which slot
every module is to be mounted, refer to the drawings on the previous
page.
For a correct mounting of the instrument, insert the modules in the
relevant slots, then, at the end, enter the central module, which can be
a blind type or an RS232 communication module; the central module
will help fixing also the other modules in the relevant slots.
To remove the modules, use a screwdriver:
A) gently depress the two fixing tabs (points "1" and "4"
in the drawing on the following page),
B) extract the central module,
C) remove also the other modules.
NOTE: any slot which has not been used must be filled with the blind
plug modules.
Zobrazit stránku 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 17 18

Komentáře k této Příručce

Žádné komentáře